Main systems to check during factory acceptance

Before delivery, the buyer's representative or technical expert may check the machine's operation at the factory. Key systems in this check.

2 min read

Hydraulic control levers

What is factory acceptance?

Before delivery, the customer's representative or technical expert checks the machine's operation at the factory. This stage also shows that the machine has been built to the quoted dimensions.

Acceptance is the final step of production. Information and images are shared with the customer at suitable stages throughout production; acceptance gives the opportunity to see the machine on site and in operation.

Systems checked

At delivery, the buyer's representative or technical expert may check the operation of the following systems:

  • Hydraulic control levers
  • Pneumatic buttons
  • Electric gauges
  • Throttle and clutch assembly
  • Drawworks
  • Control levers
  • Service hoist
  • Kelly
  • Gear system

After acceptance

At the buyer’s request, a technical team can be assigned for mounting the rig on the truck, testing, commissioning and basic training of personnel. The estimated site time is 7 working days; the exact scope and fee are set in the quote.